Friday, 14 April 2017

Day 1 ----- (12 April 2017) ----- Start the build.



12 April 2017. Big day. The project starts. Most of today is about deliveries: cement, building materials, a container for tools and stuff, scaffolding, sand, gravel. People arrive, introductions are made...
Apart from that, three main events take place today and tomorrow:
  • Clearing the site and cutting a new access road to the front of the new house-to-be.
  • Excavating the pool, cistern and septic tank
  • marking up the footprint of the foundations and footings, and determining the vertical levels of the floor-to-be ('cota cero', or ground zero).





The first of several trailers loaded with pallets of cement. 
15 pallets on each trailer, 48 x 25 Kilo bags each pallet. A lot of cement. 



Cutting our new access road to the site. It took the bulldozer all of 20 minutes.



The site has dried out a lot since February.



Shifting earth and getting the site ready for detailed marking up.



Vasile, our site manager, and Antonio starting up the laser 
to mark elevations for the footings and foundations



Clearing the site. Old house in background.



Drilling and excavating the pool



Marking up.



Unloading cement. Antonio loves his remote control.



First load of iron



Wood for shuttering



With a bit of imagination, it looks like a house