We carry on rendering external walls, working on plumbing in preparation for the micro cement covering, setting up for interior painting, ordering the kitchen and appliances, landscaping, and working on the 'old' house. I borrowed the BobCat from Enrique, and Steve helped spread 15 cubic meters of gravel on the driveway.
Monday morning: starting on the second patio wall.
A couple of hours later.
And all done. It will dry out slowly and look like the wall on the right.
View of same from further out.
Rendered wall on right side of patio has dried for 3 days.
View from the roof, with parapet rendered.
Detail of the window rendering. Love it!
Meanwhile ... Tsonyo is fitting the base for the bath tap column...
... that looks like this,
and the drain for the shower,
...and pressure tests the sink feeds.
Internal paint has arrived, along with a pile of dust sheets, rollers, fillers and brushes.
... and we have a plan of the underfloor heating system.
Meanwhile, at the old house...
Meanwhile, at the old house...
Now we need to level it off...
Tuesday, and more rendering on the roof parapets, stacks and pool hatch.
The patio north wall is drying out well. It never gets full sun, so will take a bit longer than others.
Proud owner! Rendering the guest bedroom walls.
Pool pump, filter, salt electrolysis kit, salt and filter sand delivered on Wednesday.
Yesterday we ordered the kitchen in Ibiza.
Tuesday, and more rendering on the roof parapets, stacks and pool hatch.
The patio north wall is drying out well. It never gets full sun, so will take a bit longer than others.
Proud owner! Rendering the guest bedroom walls.
Pool pump, filter, salt electrolysis kit, salt and filter sand delivered on Wednesday.
Yesterday we ordered the kitchen in Ibiza.
From the north West...
... and from the west.
Master shower floor with drain cemented in.
Master bath connections.
And for the end of Wednesday's additions, here is the pool system schematic.
Salt electrolysis system, no chlorine.
Creating the drain for the guest shower, with inclines for water flow.
The finished product a day later. Now we can start on the micro cement finish.
By Thursday, Raoul has sanded walls, cleaned and masked the woodwork in the living room, master bedroom, study, master bathroom. He will continue to prepare the whole house and then apply three or four coats of the Würth white paint.
Master bedroom ready for painting.
Also Thursday, Tsonyo is assembling the pool filtration and salt electrolysis system.
We also continue with detailed rendering, here the door sills for the guest bedrooms.
Master bathroom extension being rendered.
The west facade as of Thursday afternoon. We leave tomorrow morning, and when I return in a couple of weeks the whole house should be rendered, interior painted, bathrooms built and pool functional.