Preparing the low wall foundations: digging trench and selecting larger foundation stones.
Foundation done and first few rows up.
Partly finished wall and gravel backfill
As seen from the other end.
In late June and July we'll continue the low wall to beyond the juniper in the distance.
In late June and July we'll continue the low wall to beyond the juniper in the distance.
And from 'below' from the West. The top pointing is a sand, cement and lime mix
that will eventually dry and discolour to the same shade as the stone.
that will eventually dry and discolour to the same shade as the stone.
While Aziz worked on the wall we built a planter...
... and stocked it with lavender, rosemary and California poppies.
Also, not in photo, a hedge of oleander to the left of all this.
Also, not in photo, a hedge of oleander to the left of all this.
Some new lighting outside, ...
...and some new furniture inside.
Tidying outdoor showers and hoses, irrigation system...
All this in lovely weather, though I felt sorry for Aziz working in 30 degrees during Ramadan (he only worked mornings 8am to 2pm, but still...)




The absolutely most beautiful house I've ever seen, down to the clothes hanger racks! Such style, so much love for the details. Miraculous!
ReplyDelete