Weeks 72 and 73 - 27 August to 8 September 2018. Loadsa little and bigger things....

We were away 27 August to 3 September and have now been back for a week. While away, the lads did a lot of small and bigger jobs, like tidying up the bathrooms, finishing painting, waterproofing the whole exterior, building arquetas, laying the external water system,  and so on. No photos to show. Since we've been back we've continued working on the kitchen, building the kitchen island, fitting doors and drawers, cleaning all the windows and floors, buying furniture, commissioning the kitchen worktop, blah, blah, blah.



The solar hot water panel is installed and working, but still needs insulation for the pipework. Ventilated skylight is on.



Building the kitchen 'island'. Lots of fiddly joining, gluing and wood-cutting.
 Thank you Gerd, our neighbour, for all the help and expertise.



The pool is now complete, with automatic water levelling and auto-pH system.
Antonio bought us a vacuum cleaner as a gift. Robot on its way...



Our first items of furniture. Two pine bedsteads from Muebles Carlos, 
amazingly delivered the same day as ordered.



All bathrooms are finished apart from the shower fittings.



The trastero is taking shape. Appliances plumbed in, drinks fridge working...


On Thursday we ordered iroko worktops for the kitchen. Amazingly, Quintanilla said he could have them done by Monday next week. What? We wait with baited breath...