We're all going to take a bit of a break next week, and pick up again in September.
Monday 21 August
First job today is to unload the truck.
We ordered 4 pallets of 'arlita'.
Didn't realise how big they were. Now have more than needed...
Remove shuttering from 'petos' (parapets).
Lay second layer of 'corcho' then a poly cloth.
Start laying ceramic pellets and cement layer on top,
with sloping for rain channelling to cistern.
Finished with this stage on main roof.
Now can lay waterproof membrane, then another 10 cms of concrete,
then tiles, and that roof is done.
After the waterproof membrane is laid, the roof will be filled with water
for a few days to settle the membrane and check for leaks.
Word for the day in Romanian: 'Thank You Very Much'.
Think 'Multi Merci'.
Tuesday 22 August
Wall between hallway and guest bedroom 1
Wall between study and trastero
Other side of above, with trastero far end and aseo (cloakroom) on right
Tela asfaltica (waterproof membrane) waiting in garage...
Trastero/aseo lintel and brickwork
Neat little 'niche' built in to cloakroom wall. Why waste the space`?
End of week - 26-27 August 2017
Back in the UK, playing with kitchen designs based on the experiments we conducted on-site.
Turquoise?
Light Beige?
Light Green?
And meanwhile, back at the ranch, ladrillos continue to go up. Utility room, cloakroom and kitchen are done as far as can be.
Trastero/aseo lintel and brickwork
Neat little 'niche' built in to cloakroom wall. Why waste the space`?
Kitchen west wall brickwork for double wall. The window and shutters will slide into the left side, and need to be mounted before the bricks can be laid on that side and the lintel built.
And that's it for this week...