Tuesday, 25 July 2017

Week 14 ----- (24-29 July 2017) ----- Build living room and terrace roofs, and stairs

I leave Formentera on Monday 24th July early morning, so must rely of photos from others (especially Vasile who sends updates almost daily), until we get back there in two weeks.
As I left about half the beams had been treated, as shown in the last post. In the evening of the same day (Monday 24 July), Vasile sent me the following photos of the beams in place. Now that's progress! There are even some 'bardos' in place (the flat clay plates that span the beams).


Monday 24 July




Cross beams being placed on the west side, using the concrete wall as support. 
The next pictures shows the east side where the cross beams are 
supported by the main structural beam.



The 'big' beam supporting the cross beams.



How the main support beam and block wall interlock.
This photo is taken from living room side,
 the kitchen is the other side of the block wall.


Tuesday 25 July


On Tuesday the terrace beams go on, and ...



... all the bardos are on the living area roof as well. The terrace beams(14x14 mm) are not distressed.


Wednesday 26 July


On Wednesday, all the beams are in and all the bardos are installed as well.
This pic is taken from the living room looking out North-West
through the living room sliding doors to the porch.



From the living room looking North through the door to the NE patio.
Cross beam are slightly distressed. Bardos between beams will be rendered and painted.



The porch is covered.

The bardos are pegged about 5-10 mm above the beams to allow for  plaster under. Same applies to the living/dining/kitchen area, photo below. At 6pm in late July the dipping sun just reaches the kitchen window sill. Our calculations worked!



View of the dining area from the NE patio door south
with the door to master bedroom suite far right.


Thursday 27 July


The stairs are being built. First the reinforcement steel for the stair base, ...



...then the shuttering for the treads, with the mini-landing at top.



The second big job today is prepping the new roof for concrete.
First a breathing membrane, then steel reinforcement mesh.



Ditto for terrace (El porche) roof...


Friday 28 July



The concrete mixer is called in and the roofs are poured. 
First the terrace. This pic is facing SW.



Then the main roof above living/dining room and kitchen.
Master bedroom beyond, and our 'old' house in the background.



 Roof concrete is on! Terrace in foreground, and note the 'ridge' over the main pine beam structure
with chimney (left) and kitchen extractor (right) outlets.



The stairway to heaven is also poured and formed, along with the small landing at the top.  All roofs will get more layers of insulation, cement and tiles, and will be surrounded by 'petos' (parapets) (except terrace roof).






No comments:

Post a Comment